Works on the construction of 4 major by-passes on the Accra-Kumasi Highway has started with the clearing of the road alignment.
The eight local contractors, mobilized by the government, moved to site on the 15th June 2023.
The Chief Director of the Ministry of Roads and Highways, Ing Dr Abass M. Awolu, led a team of Engineers from the Ministry and the Ghana Highway Authority to inspect the progress of work.
The by-passes at Osino, Anyinam, Enyiresi and Konongo are part of efforts by the government to dualize the Accra-Kumasi highway to reduce vehicular traffic and accidents as well as enhance the free movement of goods and people.
Source:Mybrytfmonline.com/Kwabena Nyarko Abronoma